Worcester and Birmingham Canal

From Wikipedia, the free encyclopedia

Jump to: navigation, search
Worcester and Birmingham Canal
Image:BSicon leer.svg Image:BSicon uSTR.svg Image:BSicon leer.svg
BCN Main Line
Image:BSicon leer.svg Image:BSicon leer.svg
Gas Street Basin (Worcester Bar)
Image:BSicon leer.svg Image:BSicon uBROADo.svg Image:BSicon leer.svg
Holliday Street aqueduct
Image:BSicon leer.svg Image:BSicon uAKRZu.svg Image:BSicon leer.svg
86 A4540 Middle Ring Road
Image:BSicon leer.svg Image:BSicon uTUNNEL1.svg Image:BSicon leer.svg
Edgbaston Tunnel (105 yd)
Image:BSicon leer.svg Image:BSicon uKRZu.svg Image:BSicon leer.svg
81 Cross-City Line
Image:BSicon ugHSTR.svg Image:BSicon uxgJUNCrd.svg Image:BSicon leer.svg
Dudley Canal Selly Oak Jn
Image:BSicon leer.svg Image:BSicon uAKRZu.svg Image:BSicon leer.svg
80 A38 Bristol Road
Image:BSicon leer.svg Image:BSicon uKRZu.svg Image:BSicon leer.svg
79 Cross-City Line
Image:BSicon leer.svg Image:BSicon uAKRZu.svg Image:BSicon leer.svg
75 A441 Pershore Road
Image:BSicon leer.svg Image:BSicon uKRZu.svg Image:BSicon leer.svg
74 Camp Hill Line
Image:BSicon leer.svg Image:BSicon uJUNCld.svg Image:BSicon uHSTOPLOCK.svg
Stratford-upon-Avon Canal
Image:BSicon leer.svg Image:BSicon uTUNNELa.svg Image:BSicon leer.svg
-- Kings Norton Jn
Image:BSicon leer.svg Image:BSicon uTUNNELe.svg Image:BSicon leer.svg
Wast Hills Tunnel (2726 yd)
Image:BSicon leer.svg Image:BSicon uAKRZu.svg Image:BSicon leer.svg
67 A441 road bridge
Image:BSicon uRESRl.svg Image:BSicon uFEEDERl.svg Image:BSicon leer.svg
Upper Bittell Resr and feeder
Image:BSicon uRESRl.svg Image:BSicon uSTR.svg Image:BSicon leer.svg
Lower Bittell Resr
Image:BSicon leer.svg Image:BSicon uAKRZu2.svg Image:BSicon leer.svg
M42 road bridge
Image:BSicon leer.svg Image:BSicon uJUNCld.svg Image:BSicon uSTRrf.svg
Crown Meadow Arm
Image:BSicon leer.svg Image:BSicon uTUNNEL1.svg Image:BSicon leer.svg
Shortwood Tunnel (613 yd)
Image:BSicon leer.svg Image:BSicon uTUNNEL1.svg Image:BSicon leer.svg
Tardebigge Tunnel (580 yd)
Image:BSicon uxDOCKl.svg Image:BSicon uJUNCrd.svg Image:BSicon leer.svg
Tardebigge Wharf
Image:BSicon leer.svg Image:BSicon uSTRpr.svg Image:BSicon uRESRr.svg
Tardebigge Resr / engine house
Image:BSicon leer.svg Image:BSicon uLOCKSu.svg Image:BSicon leer.svg
29-58 Tardebigge Locks (30)
Image:BSicon leer.svg Image:BSicon uLOCKSu.svg Image:BSicon leer.svg
23-28 Stoke Locks (6)
Image:BSicon leer.svg Image:BSicon uLOCKSu.svg Image:BSicon leer.svg
17-22 Astwood Locks (6)
Image:BSicon leer.svg Image:BSicon uKRZu.svg Image:BSicon leer.svg
37 Railway bridge
Image:BSicon uFGATEr.svg Image:BSicon uJUNCrd.svg Image:BSicon leer.svg
Droitwich Canal
Image:BSicon leer.svg Image:BSicon uTUNNEL1.svg Image:BSicon leer.svg
Dunhampstead Tunnel (230 yd)
Image:BSicon leer.svg Image:BSicon uAKRZu2.svg Image:BSicon leer.svg
24A M5 road bridge
Image:BSicon leer.svg Image:BSicon uLOCKSu.svg Image:BSicon leer.svg
11-16 Offerton Locks (6)
Image:BSicon leer.svg Image:BSicon uAKRZu.svg Image:BSicon leer.svg
22A A449(T) bridge
Image:BSicon leer.svg Image:BSicon uLOCKSu.svg Image:BSicon leer.svg
5-10 Locks (6)
Image:BSicon leer.svg Image:BSicon uFGATEu.svg Image:BSicon leer.svg
4 Blockhouse Lock
Image:BSicon leer.svg Image:BSicon uFGATEu.svg Image:BSicon leer.svg
3 Sidbury Lock, Worcester
Image:BSicon uDRYr.svg Image:BSicon uJUNC.svg Image:BSicon uxDOCKr.svg
Diglis Basins and dry dock
Image:BSicon leer.svg Image:BSicon uLOCKSu.svg Image:BSicon leer.svg
1-2 wide beam locks (2)
Image:BSicon leer.svg Image:BSicon uJUNCe.svg Image:BSicon leer.svg
River Severn
Image:Gas Street Basin towards Mailbox.jpg
The start of the Worcester and Birmingham Canal at Gas Street Basin, looking south-east, towards The Mailbox
Image:DSC02079.JPG
Worcester and Birmingham Canal locks. Feb. 2007

The Worcester and Birmingham Canal is a canal linking Birmingham and Worcester in England. It starts in Worcester, as an 'offshoot' of the River Severn (just after the river lock) and ends in Gas Street Basin in Birmingham. It is 29 miles long. There are 58 locks in total on the canal, including the 30 Tardebigge Locks, one of the largest lock flights in Europe. The canal climbs 428 feet from Worcester to Birmingham.

Contents

[edit] History

The parliamentary bill permitting its construction was passed in 1791 empowering the company to raise £180,000 through 1,800 shares at a cost of £100 each. It also allowed them to raise a further £70,000, if needed, amongst themselves or by the mortgage of tolls and rates. The Act also permitted the company to allow landowners on the line to build wharfs and wharfhouse, and if they refuse to, the company are allowed to if needed. A further Act of Parliament authorised the raising of £149,929 amongst themselves or through the creation of new shares. However, the company were unable to raise the full amount of money authorised by the second Act, and so another was passed allowing them to raise £49,680. Another Act was passed to obtain more money in 1808. This Act empowered the company to raise £168,000 through the creation of 4,200 shares at £40 each. A final Act was passed in 1815 after the company had purchased land for reservoirs, which was not permitted in the previous Acts. The Act permitted the company to sell the land and to pay a debt of £29,096 to the treasurers by September 29 1815 as well, otherwise it would be taken out of the proceeds raised from selling the land.

The canal was surveyed by Josiah Clowes and John Snape. Its engineers changed often, and included Thomas Cartwright, John Woodhouse and William Crosley.

Construction of a barge-width (14 foot) canal began in 1792 from the Birmingham end, but progressed slowly. Selly Oak was reached in October 1795 and Kings Norton Junction by May 1796, meeting the new Stratford-upon-Avon Canal which had by then reached Hockley Heath. By March 1797 the 2726 yard (2493 m) tunnel at Wast Hill was open and the canal was trading to Hopwood. In 1807 the canal reached Tardebigge without the use of locks. The cost of building 14 foot locks was too great so the 56 locks down to Worcester were built to the narrow 7 foot specification, with the final two locks in Worcester being 14 foot.

The final 16 miles (26 km) was opened in December 1815. Plans to construct basins at Lowesmore and Diglis were abandoned.

Image:DSC02078.JPG
Worcester and Birmingham Canal. Feb. 2007

The Dudley Canal Line No 2 was built through the Lapal Tunnel to meet the canal at Selly Oak in 1798. The tunnel, after repeated collapses was finally abandoned in 1917 leaving a short stretch navigable between Selly Oak and a brick works at California until 1953, after which it was drained and filled in.

A major user of the canal was the Cadbury chocolate factory at Bournville.

[edit] Birmingham terminus

For twenty years direct connection to the Birmingham Canal Navigations (BCN) was prevented by the Worcester Bar, a physical barrier at Gas Street Basin, Birmingham designed so that the BCN would not lose water to the Worcester and Birmingham. Cargoes had to be laboriously manhandled between boats on either side. In 1815 an Act allowed the creation of a stop lock and the bar was breached. The Worcester and Birmingham raised their water level by six inches to minimise water loss and today the two pairs of lock gates have been removed. There were separate toll offices either side of the bar for the two canal companies. The bar still exists, with boats moored to both sides of it.

The commercial terminus in Birmingham was Worcester Wharf, a large complex extending from the bar along Bridge Street, Gas Street and Granville Street. Part of it now forms a water front to The Mailbox shopping and residential complex.

[edit] Today

The canal is popular for leisure and has a number of narrowboat hire centres at Alvechurch, Viking Afloat (Worcester), Anglo-Welsh (Tardebigge), Brook Line (Dunhampstead) and Black Prince (Stoke Prior).

The canal forms part of the Stourport Ring, which is one of the popular cruising rings for holiday boating.

[edit] See also

Wikimedia Commons has media related to:
Worcester and Birmingham Canal

[edit] Sources

  • Shill,Ray (1999). Birmingham's Canals. Sutton. ISBN 0-7509-2077-7. 
  • Priestly, Joseph (1831). Historical Account of the Navigable Rivers, Canals, and Railways, Throughout Great Britain. Longman, Rees, Orme, Brown and Green. 
  • Ordnance Survey First Edition map

[edit] External links

Views
Personal tools

Toolbox