East Coast Main Line

From Wikipedia, the free encyclopedia

(Redirected from East Coast Mainline)
Jump to: navigation, search
Image:Durham viaduct.jpg
The East Coast Main Line viaduct at Durham.
East Coast Main Line
Image:BSicon leer.svg Image:BSicon LUECKE.svg Image:BSicon leer.svg
Image:BSicon leer.svg Image:BSicon BHF.svg Image:BSicon leer.svg
Edinburgh Waverley
Image:BSicon leer.svg Image:BSicon HST.svg Image:BSicon leer.svg
Musselburgh
Image:BSicon leer.svg Image:BSicon HST.svg Image:BSicon leer.svg
Wallyford
Image:BSicon leer.svg Image:BSicon HST.svg Image:BSicon leer.svg
Prestonpans
Image:BSicon leer.svg Image:BSicon HST.svg Image:BSicon leer.svg
Longniddry
Image:BSicon leer.svg Image:BSicon HST.svg Image:BSicon leer.svg
Drem
Image:BSicon leer.svg Image:BSicon ABZlf.svg Image:BSicon STRlg.svg
North Berwick Line
Image:BSicon leer.svg Image:BSicon STR.svg Image:BSicon HSTe.svg
North Berwick
Image:BSicon leer.svg Image:BSicon BHF.svg Image:BSicon leer.svg
Dunbar
Image:BSicon leer.svg Image:BSicon eGRENZE.svg Image:BSicon leer.svg
Scotland / England
Image:BSicon leer.svg Image:BSicon BHF.svg Image:BSicon leer.svg
Berwick-upon-Tweed
Image:BSicon leer.svg Image:BSicon HST.svg Image:BSicon leer.svg
Chathill
Image:BSicon leer.svg Image:BSicon BHF.svg Image:BSicon leer.svg
Alnmouth
Image:BSicon leer.svg Image:BSicon HST.svg Image:BSicon leer.svg
Acklington
Image:BSicon leer.svg Image:BSicon HST.svg Image:BSicon leer.svg
Widdrington
Image:BSicon leer.svg Image:BSicon HST.svg Image:BSicon leer.svg
Pegswood
Image:BSicon leer.svg Image:BSicon BHF.svg Image:BSicon leer.svg
Morpeth
Image:BSicon leer.svg Image:BSicon HST.svg Image:BSicon leer.svg
Cramlington
Image:BSicon leer.svg Image:BSicon SHST.svg Image:BSicon leer.svg
Manors
Image:BSicon leer.svg Image:BSicon SBHF1.svg Image:BSicon leer.svg
Newcastle Central
Image:BSicon leer.svg Image:BSicon ABZlf.svg Image:BSicon HLUECKE.svg
Durham Coast Line
Image:BSicon HLUECKE.svg Image:BSicon ABZrf.svg Image:BSicon leer.svg
Tyne Valley Line
Image:BSicon leer.svg Image:BSicon HST.svg Image:BSicon leer.svg
Chester-le-Street
Image:BSicon leer.svg Image:BSicon BHF.svg Image:BSicon leer.svg
Durham
Image:BSicon HLUECKE.svg Image:BSicon ABZlg.svg Image:BSicon leer.svg
Tees Valley Line
Image:BSicon leer.svg Image:BSicon BHF.svg Image:BSicon leer.svg
Darlington
Image:BSicon leer.svg Image:BSicon ABZlf.svg Image:BSicon HLUECKE.svg
Tees Valley Line
Image:BSicon leer.svg Image:BSicon ABZrg.svg Image:BSicon HLUECKE.svg
Northallerton-Eaglescliffe Line
Image:BSicon leer.svg Image:BSicon BHF.svg Image:BSicon leer.svg
Northallerton
Image:BSicon leer.svg Image:BSicon HST.svg Image:BSicon leer.svg
Thirsk
Image:BSicon leer.svg Image:BSicon BHF.svg Image:BSicon leer.svg
York
Image:BSicon HLUECKE.svg Image:BSicon ABZrf.svg Image:BSicon leer.svg
North TransPennine Line
Image:BSicon KBFa.svg Image:BSicon STR.svg Image:BSicon leer.svg
Leeds
Image:BSicon BHF.svg Image:BSicon STR.svg Image:BSicon leer.svg
Wakefield Westgate
Image:BSicon STRlf.svg Image:BSicon ABZdg.svg Image:BSicon HLUECKE.svg
York & Selby Lines
Image:BSicon leer.svg Image:BSicon BHF.svg Image:BSicon leer.svg
Doncaster
Image:BSicon leer.svg Image:BSicon BHF.svg Image:BSicon leer.svg
Retford
Image:BSicon leer.svg Image:BSicon BHF.svg Image:BSicon leer.svg
Newark North Gate
Image:BSicon leer.svg Image:BSicon BHF.svg Image:BSicon leer.svg
Grantham
Image:BSicon HLUECKE.svg Image:BSicon ABZlg.svg Image:BSicon leer.svg
Birmingham to Peterborough Line
Image:BSicon leer.svg Image:BSicon ABZrg.svg Image:BSicon HLUECKE.svg
Peterborough to Lincoln Line
Image:BSicon leer.svg Image:BSicon BHF.svg Image:BSicon leer.svg
Peterborough
Image:BSicon leer.svg Image:BSicon ABZlf.svg Image:BSicon HLUECKE.svg
Ely to Peterborough Line
Image:BSicon leer.svg Image:BSicon HST.svg Image:BSicon leer.svg
Huntingdon
Image:BSicon leer.svg Image:BSicon HST.svg Image:BSicon leer.svg
St Neots
Image:BSicon leer.svg Image:BSicon HST.svg Image:BSicon leer.svg
Sandy
Image:BSicon leer.svg Image:BSicon HST.svg Image:BSicon leer.svg
Biggleswade
Image:BSicon leer.svg Image:BSicon HST.svg Image:BSicon leer.svg
Arlesey
Image:BSicon leer.svg Image:BSicon ABZrg.svg Image:BSicon HLUECKE.svg
Hitchin-Cambridge Line
Image:BSicon leer.svg Image:BSicon HST.svg Image:BSicon leer.svg
Hitchin
Image:BSicon leer.svg Image:BSicon BHF.svg Image:BSicon leer.svg
Stevenage
Image:BSicon leer.svg Image:BSicon ABZlf.svg Image:BSicon HLUECKE.svg
Hertford Loop Line
Image:BSicon leer.svg Image:BSicon HST.svg Image:BSicon leer.svg
Knebworth
Image:BSicon leer.svg Image:BSicon HST.svg Image:BSicon leer.svg
Welwyn North
Image:BSicon leer.svg Image:BSicon HST.svg Image:BSicon leer.svg
Welwyn Garden City
Image:BSicon leer.svg Image:BSicon HST.svg Image:BSicon leer.svg
Hatfield
Image:BSicon leer.svg Image:BSicon HST.svg Image:BSicon leer.svg
Welham Green
Image:BSicon leer.svg Image:BSicon HST.svg Image:BSicon leer.svg
Brookmans Park
Image:BSicon leer.svg Image:BSicon HST.svg Image:BSicon leer.svg
Potters Bar
Image:BSicon leer.svg Image:BSicon HST.svg Image:BSicon leer.svg
Hadley Wood
Image:BSicon leer.svg Image:BSicon HST.svg Image:BSicon leer.svg
New Barnet
Image:BSicon leer.svg Image:BSicon HST.svg Image:BSicon leer.svg
Oakleigh Park
Image:BSicon leer.svg Image:BSicon HST.svg Image:BSicon leer.svg
New Southgate
Image:BSicon leer.svg Image:BSicon ABZrg.svg Image:BSicon HLUECKE.svg
Hertford Loop Line
Image:BSicon leer.svg Image:BSicon HST.svg Image:BSicon leer.svg
Alexandra Palace
Image:BSicon leer.svg Image:BSicon HST.svg Image:BSicon leer.svg
Hornsey
Image:BSicon leer.svg Image:BSicon HST.svg Image:BSicon leer.svg
Harringay
Image:BSicon leer.svg Image:BSicon SHST.svg Image:BSicon leer.svg
Finsbury Park
Image:BSicon leer.svg Image:BSicon ABZlf.svg Image:BSicon HLUECKE.svg
Northern City Line
Image:BSicon leer.svg Image:BSicon SKBF1e.svg Image:BSicon leer.svg
London King's Cross


The East Coast Main Line (ECML) is the electrified high-speed railway link between London and Edinburgh connecting Yorkshire, North East England and Scotland.

The route forms a key artery on the eastern side of Great Britain and is broadly paralleled by the A1 trunk road. It links London, the South East and East Anglia with Yorkshire, the North East Regions and Scotland. It also carries key commuter flows for the north side of London. It is therefore important to the economic health of a number of areas of the country. It also handles cross-country, commuter and local passenger services, and carries heavy tonnages of freight traffic.

Contents

[edit] Route definition and description

The Network Rail definition of the ECML includes five separate lines:

Differing from the Network Rail definition the ECML is sometimes regarded as extending beyond Edinburgh to Aberdeen, running mostly right on the east coast via Kirkcaldy, Dundee and Arbroath. North of Edinburgh it includes the world-famous red cantilever Forth Bridge, and at Dundee the curved Tay Bridge both crossing wide river estuaries.

The Edinburgh to Glasgow Central via Carstairs and Motherwell line is officially part of the West Coast Main Line route, but is often considered part of the ECML because many National Express East Coast services from between King's Cross and Edinburgh Waverley use this route beyond Edinburgh.

The ECML is one of the fastest railway lines in the UK, most of the line being rated for 125 mph operation. Current UK legislation requires in-cab signalling for speeds of over 125 mph and prevents the InterCity 225 train-sets from operating at the Class 91 design speed of 140 mph in normal service. Before the present in-cab regulations came in, British Rail experimented with 140 mph running by introducing a fifth, flashing green signalling aspect on track between New England North and Stoke Tunnel. Still observable in normal service, this fifth aspect appears when the next signal is showing a green or flashing green aspect and the signal section is clear. This ensures that there is sufficient braking distance to bring a train to a stand from 140 mph.[citation needed] Locomotives have operated on the ECML at speeds of 160 mph in test runs.

The relatively high speeds are possible because the ECML travels on straight track covering the flatter, eastern areas of England, through Lincolnshire and Cambridgeshire. In contrast, the West Coast Main Line (WCML) has to traverse the Trent Valley and the mountains of Cumbria, leading to many more curves and a lower general speed limit of 110 mph. Speeds on the WCML have been addressed in recent years with the introduction of tilting Pendolino trains and upgrades to match the 125 mph speeds available on the East Coast Main Line.

[edit] History

The line was built by three railway companies, each serving their own area but with the intention of linking up to form the through route that became the East Coast Main Line. From north to south they were

  • the North British Railway, from Edinburgh to Berwick-on-Tweed, completed in 1846,
  • the North Eastern Railway from Berwick-on-Tweed to Shaftholme; the North Eastern Railway was substantially complete in 1871 when the company combined parts of several local railways and built a section to form a direct through route, and
  • the Great Northern Railway from Shaftholme to Kings Cross, completed in 1850.

The boundary between the NER and the GNR was an end-on junction, famously described as in "a ploughed field" at Shaftholme, some way north of Doncaster.

Realising that through journeys were an important part of their business, the companies established special rolling stock in 1860 on a collaborative basis; it was called the "East Coast Joint Stock".

In 1923 the three companies were grouped into the London and North Eastern Railway (LNER).

Numerous alterations to short sections of the original route have taken place, the most notable being the opening of the King Edward Bridge in Newcastle upon Tyne in 1906 and the Selby diversion, built to by-pass anticipated mining subsidence from the Selby coalfield. The Selby diversion was opened in 1983 and diverged from the original ECML at Temple Hirst, north of Doncaster, and joined the Leeds to York line at Colton Junction.

The ECML has been the backdrop for a number of famous rail journeys and locomotives. The line was worked for many years by the famous steam locomotives "Flying Scotsman" and "Mallard". Mallard achieved a world record speed for a steam locomotive, at 126 mph, and this record was never beaten. It made the run on the Grantham - Peterborough section.

Steam locomotives were replaced by diesel traction by the mid 1960s, and for a time the D200 series of diesel electric locomotives handled all the express traffic. However their limited power failed to deliver the journey time possibilities that were commercially essential, and the English Electric company built a prototype high power locomotive, the Deltic. The prototype was successful and a fleet of the locomotives was built, to handle all the important express traffic. They were powered by engines originally developed for fast torpedo boat purposes, and the configuration of the engines led to the Deltic name. Their characteristic throaty exhaust roar and chubby body outline made them unmistakable in service. The class remains the most powerful diesel locomotive in service in Britain, at 3,300 hp.

As the demand for higher speed intensified, they were eventually superseded by the High Speed Train (usually referred to as "the HST"), introduced between 1976 and 1981.

The cuttings and tunnel entrances just north of King's Cross make a memorable smoky appearance in the 1955 Ealing comedy film The Ladykillers. Also during the 1950s, the line featured in the 1954 documentary short Elizabethan Express. Later, the 1971 British gangster film Get Carter features a journey from London Kings Cross to Newcastle Central Station in the opening credits.

In what was seen by many as a surprising action for a Conservative government, the ECML was electrified in the late 1980s using state money. The electrification work began in 1985 and the initial section between King's Cross and Leeds went into operational trials in 1988. The full electrification was completed in late 1990, and the current InterCity 225 rolling stock was introduced. Diesels still operate on the ECML - Virgin's Voyager (operating CrossCountry routes), Hull Trains's Pioneers (Kings Cross - Hull) and the older HST sets working services north of Edinburgh towards Inverness and Aberdeen. East Midlands Trains also operate a limited service of HST's over a portion of the route between Doncaster and Leeds.

[edit] Capacity Problems

The ECML is one of the busiest lines on the British rail network and there is currently insufficient capacity on parts of the line to satisfy all the requirements of both passenger and freight operators. Although it has four tracks south of Stoke, 100 miles from Kings Cross, a major bottleneck remains in the twin-track section at Welwyn North, crossing Digswell Viaduct (sometimes referred to as Welwyn Viaduct) and passing through the two Welwyn tunnels, north of London. There is also a long double track section at Stilton Fen, between Huntingdon and Peterborough. A further operating constraint is the flat junction at Hitchin, where numerous down outer suburban trains have to cross three other tracks on the level; at this point long-distance trains should be running at full speed, so that to avoid a signal check, the route needs to be set for a considerable distance ahead of them.

There is also a flat crossing with the Nottingham-Lincoln line just north of Newark station. Doncaster station also presents difficulties due to the limited facilities for terminating branch trains on the up side of the station.

There is often congestion south of Newcastle, which has led to proposals to reopen the Leamside line to passenger and freight traffic.

However, in 2006, the Allington Chord was constructed near Grantham, which allowed services between Nottingham and Skegness to pass under the line, rather than crossing it at a flat junction. This provided sufficient extra capacity for GNER to run 12 additional services between Leeds and London each day[1][2].

When the line was electrified, there was extreme pressure from the Department for Transport (as proxy for the taxpayer) to reduce avoidable costs, and the overhead line equipment (the traction supply to the trains, usually referred to as "the OLE") was constructed with an unusually wide spacing of support masts[citation needed], leaving the OLE vulnerable to disruption in the event of high winds. There have been several dewirements over the years from this cause. More can be found on this subject in Christian Wolmar's book On The Wrong Line.

[edit] Proposed Improvements

Over the years successive infrastructure managers have developed schemes for route improvements[citation needed]; these include

  • Quadrupling the Welwyn North section, involving probable double-decking of the viaduct and duplication of the two tunnels,
  • Full reversible signalling over the Stilton Fen section
  • Power supply upgrades along the route, including some OLE support improvements
  • Power supply enhancement on the diversionary Hertford Loop route
  • Provision of an extra platform at Kings Cross (the so-called "platform Y")
  • Provision of a grade-separated junction at Hitchin North enabling down Cambridge trains to cross the main line
  • Provision of a new Up Bay platform at Doncaster
  • Enhanced passenger access to the platforms at Peterborough and Stevenage
  • Introduction of 140mph line speeds
  • Abolition of the Newark Flat Crossing
  • Major remodelling of Peterborough Station
  • Reopening of freight diversionary routes

The funding policy of the DfT at present means that it is difficult to be optimistic that many of these proposals will be carried forward.

[edit] Accidents

The ECML has been witness to a number of incidents resulting in death and serious injury:

[edit] Operators

Image:NXEC HST 43300 S Crozier.jpg
The main provider of services on the line, National Express East Coast

The line's current principal operator is National Express East Coast (NXEC), whose services include regular trains from King's Cross to Leeds and Edinburgh.[3] Other operators of passenger trains on the line are:

  • First Capital Connect: commuter services between King's Cross, Peterborough, Cambridge and King's Lynn and between Moorgate and Stevenage via either Welwyn Garden City or the Hertford Loop.
  • Hull Trains: between Kings Cross and Doncaster, continuing to Hull.
  • East Midlands Trains
    • East Midlands Connect: between Grantham and Peterborough, part of the service that runs between Liverpool Lime Street and Norwich.
    • East Midlands Mainline: between Doncaster and Leeds, extensions of services running to/from Sheffield, Leicester and London St Pancras. Occasional services run between Doncaster and York.
  • CrossCountry: cross-country services north of Sheffield are routed via either Leeds or Doncaster. Leeds trains use the ECML between Wakefield Westgate and Leeds and then again north of York. Doncaster trains use the ECML north of Doncaster. Services run to and beyond Edinburgh. Occasional services run from Doncaster to Leeds before rejoining the ECML at York.
  • First TransPennine Express: between York and Newcastle and between York and Northallerton before they divert off the ECML to Middlesbrough via Yarm.
  • Northern Rail: suburban services from Doncaster to Leeds and Chathill to Newcastle via Morpeth railway station and infrequent services between Newcastle and Darlington that continue to Middlesbrough and Saltburn.
  • First ScotRail: services between Edinburgh and North Berwick.
  • Grand Central Railway: intercity from Kings Cross to Sunderland, branching off the main line at Northallerton

Eurostar previously held the rights to run five trains a day on the line for services from continental Europe to cities north of London, as part of the Regional Eurostar plan, although such services have never been run.[4]

English Welsh & Scottish Railway Ltd (EWS), FirstGBRf, Freightliner Ltd, Freightliner Heavy Haul Ltd and Direct Rail Services Ltd (DRS) operate freight services.

[edit] References

  1. ^ New services are just the ticket. BBC News Online (2005-10-13). Retrieved on 2007-12-17.
  2. ^ Trains get 6,000 more seats a day. BBC News Online (2007-05-21). Retrieved on 2007-12-17.
  3. ^ National Express awarded contract for growth on InterCity East Coast. Department for Transport.
  4. ^ 'Phantom trains' haunt drive to improve East Coast line. The Daily Telegraph (2006-04-10). Retrieved on 2007-12-17.
Wikimedia Commons has media related to:
East Coast Main Line
de:East Coast Main Line

fr:East Coast Main Line

Views
Personal tools

Toolbox